TH2, Global Gate Tower 4, Ground Floor, Saadiyat Island
single page feature image

Mixed-use development situated on a 5,906 sqm site located on the north-eastern corner of Reem Island; at the entrance of Shams Abu Dhabi and close to the Gate district. Plot C12 is adjacent to the canal and beach front, the land use of C12 permits development of a residential tower with a total gross floor area of 35,522sqm, of which, 3,190sqm is allocated for retail use.  The sizes and mix of the residential units, as shared with the bidders, are outlined in the table below. It must be noted that the target of 270 units is a risk. On the Plot Regulation Sheet, 180 units are approved. The mitigation strategy for this risk is to collate a technical case, which will include an assessment against infrastructure loads and the traffic model. This case will be presented to Aldar Properties, the master planner of the district, and support and approval of the increase will be requested.

Amenities and services are to be located in the base of the tower together with parking.

    Project Details

  • Category:
  • Location: Al Reem Island, Abu Dhabi
  • Nature: Mixed-use Residential Tower
  • Plot Area: 5,906 sqm
  • GFA: 35,522 sqm
  • No of Units: 270 Units
  • Types of Units: Apartments | Retail
  • Project Value: AED 400 Million
  • Handover Date: TBA

C12 Building

Mixed-use development situated on a 5,906 sqm site located on the north-eastern corner of Reem Island; at the entrance of Shams Abu Dhabi and close to the Gate district. Plot C12 is adjacent to the canal and beach front, the land use of C12 permits development of a residential tower with a total gross floor area of 35,522sqm, of which, 3,190sqm is allocated for retail use.  The sizes and mix of the residential units, as shared with the bidders, are outlined in the table below. It must be noted that the target of 270 units is a risk. On the Plot Regulation Sheet, 180 units are approved. The mitigation strategy for this risk is to collate a technical case, which will include an assessment against infrastructure loads and the traffic model. This case will be presented to Aldar Properties, the master planner of the district, and support and approval of the increase will be requested.

Amenities and services are to be located in the base of the tower together with parking.